Hankintapäätös
The contract includes 9 mobile Passenger Boarding Bridges (PBB) with Docking Guidance System (DGS), with communication interface to existing gate operation and management system.
Furthermore, the contract includes an option on 6 additional PBBs and 20 DGS.
The contract includes after sales service, incl. spare part supply for minimum 15 years.