Keljonlahti Steam Turbine Overhaul in Jyväskylä, Finland

Hankinnan yleistiedot

05 - Hankintailmoitus – erityisalat (5)
Avoin menettely
29.12.2018 10.24 (GMT+02:00)
4.1.2019 16.00

Hankintayksikkö

Jyväskylän Voima Oy Jyväskylän Voima Oy
Timo Hämäläinen
Keljonrannantie 276
40350 Jyväskylä
Suomi
2033847-1

Määräaika on umpeutunut

Lyhyt kuvaus

Jyväskylän Voima Oy is operating Keljonlahti CHP power plant in Jyväskylä, Finland. Keljonlahti. Plant started its operations in 2010. Turbine has been manufactured by LMZ in St. Petersburg, Russia and commissioned in 2010. The turbine is a triple casing, extraction-condensing. The unit has currently more than 41000 h of operation time. Total numbers of start up are 43. Scope of delivery shall include the major overhaul works for Keljonlahti steam turbine. In general, overhaul works are: 1) Turbine disassembly, cleaning, inspection and measurements, repair and re-assembly; 2) Disassembly, cleaning and inspection and re-assembly of servomotors; 3) Commission and hot start.

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600