Dialogue about requirements for a new compressor station at Zealand for the Baltic Pipe project.

Hankinnan yleistiedot

Ei käytettävissä
1.9.2017 11.44 (GMT+03:00)

Hankintayksikkö

Energinet.dk Energinet.dk
Kirsten Ebstrup Kirsten Ebstrup
Tonne Kjærsvej 65
7000 Fredericia
Tanska
28980671

Lyhyt kuvaus

The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a sub-sea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a sub-sea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. One of the main components for the Baltic Pipe Project is a new compressor station on Zealand that will pressurize the gas before the sub-sea pipeline to Poland. Energinet intends to hold initial market consultations with relevant suppliers of centrifugal gas compressor units starting in week 38, in order to properly prepare for the coming tender and to get relevant market insights.

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600