Hurdalssjøen water treatment plant E61 Machine and process equipment.

Hankinnan yleistiedot

Neuvottelumenettely
7.11.2015 10.47 (GMT+02:00)
8.12.2015 13.00

Hankintayksikkö

Ullensaker kommune Ullensaker kommune
Ingar Tranum Ingar Tranum
Rådhuset, Furusethgata 12
2051 Jessheim
Norja
933 649 768

Määräaika on umpeutunut

Lyhyt kuvaus

Ullensaker kommune shall build a new water treatment plant using Hurdalssjøen as the water source. The plant shall deliver water to the municipality including Oslo Airport Gardermoen.

The water treatment process is: The Molde process (direct filtration which combines colour removal and carbonisation in the same triple media filter), and UV disinfection. Sludge treatment with dewatering.

The new plant is divided into 4 plant sections/buildings: Process facility, clean water basin, clean water pumping station, raw water pumping station.

The development will be executed with 4 parallel contracts. The primary elements in this contract, E61, are: Pipelines for process (mainly in stainless steel), valves and fittings, pumps, process air, UV system, measuring equipment, chemical dosing, sludge treatment. Required clean water quantity: 465 L/s

This tender process concerns the pre-qualification (part one of two) for contract E61 Machine and process equipment.

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600