The project includes construction of new grade separated crossing on E134 at Førrestjørn. In addition the adaptation of the existing open air road and diverse works in the Førres tunnel. Total road length including tunnel and all side roads is approximately 1 850 m
Below is a list of the key elements in the project:
— E134 open air road with normal road width of 12.5 m, length approximately 850 m
— Various works in the Førres tunnel normal profile of approx. T9.5, length approximately 300 m
— Two grade separated crossing at Førrestjørn approx. profile 750 with connections to the local road network. Length of ramps approx. 400 m
— Conversion/adaptation of existing local roads and access roads approx. 600 m
— Foot and bicycle roads/paths approx.180 m
— Tunnel portal Førres tunnel east, width 14.7-15.0 m, length 20 m
— Carpark with associated roads at two grade separated crossing profile 760
— 2 bus bays at the two grade separated crossing
— Noise barriers length approx.510 m
— Noise embankment length approx. 35 m.
— Temporary bypass road during closing of the tunnel.