Lyhyt kuvaus
The scope of work for this contract is described in the “Scope of Work” document in B1 Scope of Work description, CS Guides-Vanes-Screens, OSC-30-H004-M-SP-00050.
The flow conditioning system (CS Guides Guides-Vanes-Screens) is part of the total current system in the basin. The purpose of the flow conditioning system is to ensure good flow quality in the test basin. Contractor shall be responsible for the final mechanical design of the system.
Contractor shall perform the systems engineering, fabrication engineering, design and documentation required for the manufacturing, fabrication, installation, and completion of the Works. Contractor shall also produce all documentation required for the civil interfaces and interfaces to technical systems.
We encourage suppliers to submit a total tender including the total scope and to co-operate to achieve this.