This tender contains a binding scope of seven on- and offshore connections with 525 kV HVDC power cables on basis of EPCI-contracts. The four offshore and three onshore projects are divided into three lots (1 - 3) containing an overall binding volume of 3.536 km core cable length. Additionally the contracting Entity is awarding a lot (Lot 7) with optional volume for future projects with an expected volume of 900 km core cable length and a maximum volume of 2.700 km core cable length.
The complete scope of Works is included in the (individual) lots 1, 2 and 3 (commitment to purchase by the Contracting Entity) and lot 7 (no commitment to call-off by the Contracting Entity). Lots 4 – 6 are combinations of lots 1 – 3, each comprising two lots from 1 - 3. It is clarified, that the scope of Works in the (individual) lots 1, 2 and 3 is identical to the scope of works of combination lots 4, 5 and 6 and that the scope of works will only be awarded once.