Информация о тендере
National road 4 Almenningsdelet – Lygnebakken:
The contract work consists of engineering design services for and the construction of approx. 610 m new two lane road in the area past Lygnasæter, width expansion of an existing road to 9 m at Lygnasæter, and width expansion of the remaining lot from Almenningsdelt to Lygnebakken. In addition a new local road is to be constructed including a foot/cycle path from Pukk 1 to the new exit from national road 4 to Lygna Pukk, with continuation of the foot/cycle path until the ski car park at Lygna. The contract also includes the construction of a combined foot/cycle path and concrete ski bridge over the existing national road. 4. The stretch must have street lights. In addition there will be an option for an extension of the street lights northwards to the existing street lights.