The new water source will be connected to the new water treatment plant. Contract K01 comprises parts of the transmission pipeline and covers approx. 5.5 km of new main water pipeline.
The upper part and the crossing of Hornnes Lake are in 630 PE100 (approx. 1.1 km + 0.6 km), the remaining part is in 500 mm tensile strength ductile cast iron. The installation is mainly to be established as a pipeline in a ditch with an average covering of 1.6 m (1.2 - 4 m). The contract also includes associated valve manholes, air manholes, local supply pipeline, and sewage water pipeline, conduits, and cables. A path over the route is also to be established along Slettebø Lake for approx. 1200 m.