Информация о тендере
Tampereen Sähkölaitos Oy (later also the Purchaser) is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will renew also the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. Existing old steam turbine will be utilized and a new steam turbine will not be installed during the project. The Purchaser is named the project NSL3. This contract notice is published to purchase of NSL3 Heat Pump Plant of CCW System. This procurement is concerning the supply of NSL3 Heat Pump Plant of CCW System. The supply consisting of the full process delivery of the heat pump plant of closed cooling water (CCW) system containing the all necessary auxiliary equipment with piping and cabling of full operating plant excluding the main pipe work and the civil works.