Tiedosto |
Koko |
0. Template for submitting questions 5.0.docx |
599 KB |
Appendix 3b - Fortrolighedserklæring (NDA) 6.0.pdf |
134 KB |
Appendix 4a - Labour clause and apprentice_trainee_intern clause 2.0.pdf |
122 KB |
Appendix 4b - The contractor's compliance with the labour clause and apprentice_trainee_intern clause of the contract 3.0.pdf |
177 KB |
Appendix 7 - Formular til aftale om udførelse af varmt arbejde - Gjensidige 1.0.pdf |
42 KB |
Appendix 8 - Information to external partners on healthy and safe work 2.0.pdf |
138 KB |
Appendix 11 - APP Operational Requirements 3.0.pdf |
116 KB |
Appendix 14 - Subcontractor declaration 5.0.docx |
599 KB |
Attachment 002 Standard for mechanical installations 1.0.pdf |
991 KB |
Attachment 003 General requirements specification for documentation 1.0.pdf |
545 KB |
Attachment 004 Standard for technical numbering 1.0.pdf |
238 KB |
Attachment 005 BIOFOS Construction site conditions 1.0.pdf |
556 KB |
Attachment 010 Health and Safety Plan 1.0.pdf |
411 KB |
Attachment 011 Health and Safety Plan, PSS, Attachment C – Construction Site Sketch 1.0.pdf |
283 KB |
Attachment 012 Tasks of working environment coordination 1.0.pdf |
144 KB |
Attachment 013 Safety Data Sheet, fly ash 1.0.pdf |
103 KB |
Attachment 015 Safety Data Sheet, HOK 1.0.pdf |
90 KB |
Attachment 016 Safety Data Sheet, residual product 1.0.pdf |
105 KB |
Attachment 050A BIOFOS General requirements specification for electrical installations (Danish) 1.0.pdf |
448 KB |
Attachment 050B BIOFOS General requirements specification for electrical installations (english) 1.0.pdf |
449 KB |
Attachment 051, 01E00DPS_0020 1.0.pdf |
6,23 MB |
Attachment 052 BIOFOS General requirements specification for instrumentation 1.0.pdf |
305 KB |
Attachment 053 General requirements specification for TIA programming 1.0.pdf |
694 KB |
Attachment 054 TIA Guideline for setting up communication between S7-1500 1.0.pdf |
723 KB |
Attachment 055 Technical documentation for switchgear 1.0.pdf |
17,04 MB |
Attachment 056, 01E00LD0_NNN_TIA 1.0.pdf |
6,74 MB |
Attachment 057, 01E00LDBQM 1.0.pdf |
9,55 MB |
Attachment 058 Interface point PID 1.0.pdf |
5,86 MB |
Attachment 101 STAMDATA ARK (Master Data) Guidelines for Master data 1.0.xlsx |
186 KB |
Attachment 201 Slamforbrænding, Længdesnit.R01 1.0.pdf |
277 KB |
Attachment 202 Ledningsplan indeholdende Grundplanen.R01 1.0.pdf |
3,65 MB |
Attachment 203 Elektrofilters røggaskanal til spraykøler 1.0.pdf |
274 KB |
Attachment 204 Posefilters røggaskanal til skrubber 1.0.pdf |
180 KB |
Attachment 205 Process Equipment draw. ISO view 1.0.pdf |
742 KB |
Attachment 206 Opstillingstegning over processudstyr 1.0.pdf |
392 KB |
Attachment 207 Opstillingstegning over processudstyr 1.0.pdf |
348 KB |
Attachment 208 Process Equipment arrangement draw. Plan view +7.35_R01 1.0.pdf |
463 KB |
Attachment 301 Contractor civil scope.R00 1.0.pdf |
346 KB |
Appendix 6 - Client's Requirement 1.0.pdf |
317 KB |
Appendix 10 - Operational and Functional Guarantee Data 1.0.xlsx |
44 KB |
Appendix 12 - Tender List 1.0.xlsx |
61 KB |
Attachment 014 Safety Data Sheet, BiCar 1.0.pdf |
66 KB |
Attachment 059 List of Electrical Consumers 1.0.pdf |
209 KB |
Attachment 060 Summary view of all existing cables 1.0.pdf |
2,06 MB |
Attachment 102 BIM Specifications A102a EN 1.0.pdf |
349 KB |
Attachment 103 CAD Coordination Manual 1.0.pdf |
1,37 MB |
Attachment 209 RL_FGT retrofit_Indicative model_20230329 1.0.nwd |
3,87 MB |
Attachment 210 BIOFOS Lynetten_3D_model_ifc 1.0.ifc |
2,25 MB |
Attachment 212 RL_grid 1.0.dwg |
152 KB |
Appendix 7 - DBI agreement form hot work 1.0.pdf |
150 KB |
0. General conditions for invitations to tender (notice inviting tenders) - version 3, dated 04-05-2023 28.0 |
332 KB |
Appendix 5 - Master Programme, version 2, dated 04-05-2023 2.0 |
647 KB |
Appendix 6 - Part 1 Design Basis, Scope of Works, Supply Limits, version 2, dated 04-05-2023 2.0 |
418 KB |
Appendix 6 - Part 4 Process and Design Data, version 2, dated 04-05-2023 2.0 |
402 KB |
Appendix 13 - Technical Forms, version 2, dated 04-05-2023 2.0 |
73 KB |
0. Design and build contract (DRAFT), version 3, dated 15-06-2023 33.0 |
307 KB |
Appendix 1a - Amendment sheet dated 15-06-2023 19.0 |
225 KB |
Appendix 2 - ABT 18 - BIOFOS (EN), version 3, dated 15-06-2023 7.0 |
409 KB |
Appendix 3a - Databehandleraftale (DPA), version 2, dated 15-06-2023 6.0 |
188 KB |
Appendix 6 - Part 2 Technical specifications for flue gas treatment, version 3, dated 15-06-2023 3.0 |
1,02 MB |
Appendix 6 - Part 3 General Tech spec og projec requirements, version 2, dated 15-06-2023 2.0 |
570 KB |
Appendix 6 - Part 5 Attachments, version 2, dated 15-06-2023 2.0 |
376 KB |
Appendix 9 - Guarantees and Damages, version 2, dated 15-06-2023 2.0 |
440 KB |
Attachment 001 Documentation schedule final, version 2, dated 15-06-2023 2.0 |
396 KB |