Assignment text
The Contracting Authority is in the process of replacing a 400kV power connection between Denmark and Sweden, named FL25 System. Energinet and Svenska Kraftnät are preparing the replacement of the old cable system, with this initial survey that will be followed by the removal of the old cables and installation of a new cable sys-tem.