Short description
Lounavoima Oy is planning to construct a new Waste to Energy (WtE) CHP Plant to Korvenmäki, Salo. The new CHP plant will be located at the green field site adjacent to the existing municipal landfill site. Korvenmäki WtE plant is going to use source separated municipal solid waste (MSW) as main fuel. The new plant will be designed for 120 000 t/a waste fuel. The combustion and heat recovery technology is based on grate boiler technology. The WtE plant will be purchased preliminary in 6 packages (lots). The object of this procurement is lot 4. Lot 4 purchasing package will preliminary include waste handling cranes, electrification, automation and instrumentation systems etc. as specified in more detail in the tender documents. Notice that all times presented are Eastern European summer time (Helsinki, Finland; UTC/GMT + 3 hours).