Nordby tunnel shall be renovated and two-way traffic shall be established in the
southbound lanes. Local SRO installations, speed limit signs, signs for
oncoming traffic, cables, other material shall be delivered, as well as assembly, installation, programming and commissioning. The work will be carried out on and by a busy road. This means that night work must be priced.
The objective of the procurement is:
When the work is carried out in the northbound lanes, the southbound lanes shall have 2-way traffic. All
installations are in the southbound lanes. The installations shall have two scenarios, normal traffic in all the tunnel lanes and two-way traffic in the southbound lanes.