Short description
The contracting authority needs to enter into a framework agreement for the hire of excavators and drivers within multiple categories.
The contract includes the following:
1) Assignments of varying lengths for the construction department for water and sewage (municipal site teams). The contract consists of 7 categories.
The categories consist of the following:
1) Wheeled loader between 14 and 16 tonne;
2) Track loader of approx. 8 tonne;
3) Track loader of approx. 16 tonne;
4) Track loader of approx. 20 tonne;
5) Track loader of approx. 30 tonne;
6) Track loader with short stem, approx. 20 tonne;
7) Track loader with short stem, approx. 25 tonne.