Assignment text
A foot and cycle path shall be construction from the roundabout Begby to Borge school. The road must be subject to pavement widening and shall partly be constructed in a new curve from profile 0 at the roundabout to profile 1 000.
The road shall also be constructed outside of the burial ground as a new road from approximately profile 1 000 to approximately profile 1 800. The project is a design-based project. Contracts shall not be transferred. The road works shall be initiated from summer 2019 until completion during the early summer 2021. A new foot and cycle culvert shall be constructed in the crossing County Road 113 — Borgeveien. Water and sewer pipes and cables, as well as street lights shall be established along the entire section. The crossing County Road 110 x 532 must be renovated at the end of the section, approx. Profile 2 800.